Hydraulic Workover Equipment
It is an innovative stand-alone full-hydraulic workover equipment based on our research experience of offshore workover rigs and stand-alone snubbing units in combination with...
Product introduction
It is an innovative stand-alone full-hydraulic workover equipment based on our research experience of offshore workover rigs and stand-alone snubbing units in combination with offshore platform workover operation need
Suitable for high-dense cluster wells, small well site and offshore platform
Modular lightweight design, the single module is less than 8T
Key features
Short factual bullets extracted from the source text.
- Rapid movement between wells, and the cost of installation and transportation is 30% less
- Working pressure and lifting capacity need to stay aligned.
- Hydraulic control helps manage the intervention sequence.
- Tubular size range must match the service plan.
- Pressure control is a core safety requirement.
Application
Compared with the conventional workover rigs with the mechanical drive,high mast and complicated structure, it is fully hydraulically powered.Hydraulic cylinders and hydraulic motors will accomplish the lifting,snubbing and rotating of tubing, with the advantages such as heavy load, large torque, optimized centralized control of operation console and convenient operation. This equipment is featured by simple structure, compact layout and light weight. It is fitted with hydraulic skidding base and integrated wellhead device, meeting the requirements for offshore cluster-well operation and integral movement. Its successful development has filled the void of high-end offshore hydraulic workover rig in China, with 8 national patents awarded.
Product Parameters
| Model | XJY160 - 270 |
|---|---|
| Max. lifting load kN | 1600~2700 |
| Max. snubbing load kN | 800 ~ 1350 |
| Pipe size in | 2 - 3/8" ~ 9 - 5/8" |
| Rotating torque kN.m | ~30 |
| Stroke m | 3.0 5/3.5 |
| Cylinder (pc) | 4 |
What buyers check before shortlist
Practical points that help compare this model family with the site condition and installation plan.
- Hydraulic Workover Equipment has export history context, but rigging speed and transport count still matter.
- It is an innovative stand-alone full-hydraulic workover equipment based on our research experience of offshore workover rigs and stand-alone snubbing units in combination with offshore platform workover operation need.
- Suitable for high-dense cluster wells, small well site and offshore platform.
How to read this model
A short buyer-oriented note for the models that otherwise read too thin.
Hydraulic Workover Equipment is a control-heavy rig package, so working pressure and lifting load have to stay aligned with the well condition.
Tubular size and control system are not side notes here; they decide whether the unit is actually usable on the target well.
If the site combines pressure and load constraints, the page should make that relationship obvious before the buyer asks for a quotation.
The pressure-control stack, hydraulic power unit, and safety sequence should be readable as one operating chain.
Buyers often want to see whether the unit is built for land work, offshore work, or both before they look at the final numbers.
Why this model matters
Extra buyer-facing context for the thinnest product pages.
Hydraulic Workover Equipment should be read as a pressure-control package first and a lifting package second.
Working pressure, tubular size, and control system need to line up or the unit will not stay practical on a real well.
If the site is offshore, deck space and lifting access should be checked before the buyer signs off.
The page becomes more useful when it explains how the well condition changes the choice of unit.
A snubbing page is easier to trust when it explains the pressure-control stack instead of only the frame and load numbers.
Remote or automated control matters most when the well gives the crew very little room to correct a mistake.
How buyers should read this model
A tighter reading guide for shorter product pages.
Hydraulic Workover Equipment should be checked as a pressure-control package first, because working pressure, lifting load, and tubular size have to stay aligned.
The hydraulic stack and control logic matter because snubbing work leaves very little room for trial and error on site.
If the project is offshore or space-limited, deck access and installation sequence should be part of the shortlist decision.
The buyer also needs to see whether the package is built for a simple land well or for a tighter offshore intervention sequence.
A short page note about the pressure-control path is often more useful than another broad claim about the frame itself.
A snubbing buyer usually also wants to know how the unit handles the transfer between well control and lifting work.
If the deck or pad is constrained, the rig-up path can be as important as the rated load.
The page should make it obvious whether the unit is meant to reduce handling steps or to support a heavier well-control package.
Related reading
Move from the model page to the guidance that explains the same buying family.
Snubbing Units
Back to the category guide
NewsCold-weather and desert rigs solve different problems
Climate adaptation is not cosmetic; it affects insulation, filtration, heating, and mobility choices.
FAQHow do I choose the right model?
Start from the working condition, target capacity, mounting type, and control preference. Then compare the category-specific fields on the product page before asking for a quotation.
Related products
Same category options and adjacent use cases.
Medium And low Pressure Oil Well
SDYJ160 Remote Control Snubbing Units
High Pressure Oil And Gas Wells
Tell us the operating condition, target output, or installation constraint and we will point to the matching model.
Contact Us