Drilling Equipment

Stepping Type Drilling Rig

Aiming at the development of well-plant for domestic and overseamarket, series stepping type drilling rig has been developed to effectively solve the problems of low...

Stepping Type Drilling Rig
Overview

Product introduction

Aiming at the development of well-plant for domestic and overseamarket, series stepping type drilling rig has been developed to effectively solve the problems of low efficiency, poor safety and large well site area

It is the first time in China to achieve full drilling rig and fast movementbetween any wells, helping the development of National Fuling shale GasDemonstration Zone

Full movement: Adaptable to any layout of platform well location,movement time between 10m well spacing is less than 2 hours

Features

Key features

Short factual bullets extracted from the source text.

  • Synchronous control: The deviation of multiple groups of translation cylinders shall not exceed 2%
  • Remote control operation: convenient for operators to observe
  • Quick alignment of wellhead, with the function of leveling after foundation subsidence
  • Stepping movement helps with controlled relocation across the site.
  • Mast and base package should stay stable during each move.

Application

Remote Control

Used for drilling sites where staged movement is part of the operating sequence

Parameters

Product parameters

Series-based parameter reference for Stepping Type Drilling Rig when no source table is available.
ParameterUnitValue
Model-Stepping Type Drilling Rig
Rig Type-Land drilling rig
Rated Drilling DepthmModel dependent
Mounting Type-Model dependent
Mast Type-Model dependent
Drive System-Model dependent
Control System-Model dependent
Environmental Adaptation-Land operating package
Working Location-Onshore drilling operations
Deployment Type-Fast rig-up and relocation
Key Advantage-Designed for transport, setup, and site-fit efficiency
Selection

What buyers check before shortlist

Practical points that help compare this model family with the site condition and installation plan.

Specification guide

How to read this model

A short buyer-oriented note for the models that otherwise read too thin.

Stepping Type Drilling Rig should be read together with depth class, mobility, and the rig-up sequence rather than as a stand-alone machine name.

When the model is built for desert, cold-weather, or cluster-well work, the real difference is how the package adapts to the site condition.

The buyer usually needs to know whether the rig can move, set up, and keep operating within the route and pad constraints.

Transport height, substructure style, and mast handling should not be hidden behind a generic model label.

A good rig page also tells the buyer whether the layout favors quick relocation or a heavier duty cycle on a stable pad.

Comparison note

How buyers should read this model

A tighter reading guide for shorter product pages.

Stepping Type Drilling Rig should be read together with depth class, mobility, and the rig-up sequence rather than as a stand-alone machine name.

When the model is built for desert, cold-weather, or cluster-well work, the real difference is how the package adapts to the site condition.

The buyer usually needs to know whether the rig can move, set up, and keep operating within the route and pad constraints.

A drilling page is easier to trust when it explains what the rig can handle on the road, on the pad, and under the intended well program.

Transport height, substructure style, and mast handling should not be hidden behind a generic model label.

A good rig page also tells the buyer whether the layout favors quick relocation or a heavier duty cycle on a stable pad.

If the site includes terrain or climate stress, the buyer should be able to see that adaptation in the wording immediately.

The page should also say whether the mast and substructure are built for a faster lift sequence or for a heavier transport package.

For many buyers, the important question is whether the rig logic reduces setup time without complicating maintenance access.

A useful drilling page makes the depth target, relocation path, and site adaptation visible in the same frame.

A drilling buyer also checks how the rig handles pad spacing, road permits, and mast movement during relocation.

If transport height is high, the page should make the movement constraint visible instead of burying it.

The most useful comparison is the one that keeps depth target, site adaptation, and setup time in the same frame.

That is what lets the buyer shortlist quickly without guessing at the operating envelope.

Selection resources

Related reading

Move from the model page to the guidance that explains the same buying family.

Related

Related products

Same category options and adjacent use cases.

Tell us the operating condition, target output, or installation constraint and we will point to the matching model.

Contact Us